Digital control: every figure sourced, every calculation tested.

We run our analyses on calculation tools we built ourselves. Every tool is automatically tested against hand-calculated examples. The panels below are built from the actual output of these tools for a fictional sample project.

The project, company names and all amounts in the panels are fictional and do not represent any real client or project. The panels illustrate our analysis method; they are not a software product for sale.

01

Project financial control

Budget, actual spend and remaining budget, with a twelve-month cash flow and a minimum cash threshold. Months that fall below the threshold are flagged in advance.

What do you gain? You see a cash squeeze months ahead, not at month end.

Project financial controlDemo interface · fictional data
Budget100,000USD
Actual spend80,300USD · Reporting month: Apr 2027
Remaining budget19,700USD
Actual spend80%
Month-end cash · USDLowest cash: −20,561 · Apr 2027
Minimum cash threshold 5,00029k0−21kJanFebMarAprMayJunJulAugSepOctNovDec
Panel summary: Budget 100,000 USD, Actual spend 80,300 USD, Remaining budget 19,700 USD; Lowest cash −20,561 USD (Apr 2027).

02

Progress payments & project tracking

Progress percentage, the status of every payment application, approval steps and payment tracking on one screen.

What do you gain? It is clear where each application is waiting and when it will reach the bank.

Progress payments & project trackingDemo interface · fictional data
73%Progress
Contract value120,000USD
Paid applications25,739USD · Reporting month: Apr 2027
Terms45 days
Approval process · Application #4
  1. Preparation
  2. Site check
  3. Client approval
  4. Payment
  1. #1Jan 202711,564PaidPayment: Mar 2027
  2. #2Feb 202714,175PaidPayment: Apr 2027
  3. #3Mar 202724,399Approved · awaiting paymentPayment: May 2027
  4. #4Apr 202715,366In approvalPayment: Jun 2027
  5. #5May 202715,553PlannedPayment: Jul 2027
  6. #6Jun 20278,944PlannedPayment: Aug 2027
Panel summary: Progress 73%; Paid applications 25,739 USD; #1 Paid; #2 Paid; #3 Approved · awaiting payment; #4 In approval; #5 Planned; #6 Planned.

03

Procurement & bid comparison

Bids are brought onto a common bill of quantities; missing items are completed, out-of-scope items separated and adjusted totals compared.

What do you gain? You know whether the cheapest-looking bid is really the right choice.

Procurement & bid comparisonDemo interface · fictional data
Adjusted total · USDRank
  1. 1Firma A114,020Bid total: 109,170 · 1 missing item(s)
  2. 2Firma C116,570Bid total: 120,470 · 1 out-of-scope item(s)
  3. 3Firma B117,040Bid total: 109,940 · 1 missing item(s)
Lowest–highest spread3,020USD
Spread2.6%relative to the lowest bid
BoQ items10
Panel summary: 1. Firma A 114,020 USD; 2. Firma C 116,570 USD; 3. Firma B 117,040 USD; Lowest–highest spread 3,020 USD (2.6%).

How it works

Calculation engine

The bid-comparison, payment and cash, and profitability tools read Excel input and produce an Excel result and a draft report. Automated tests run after every change.

Professional report

Findings become a branded Word and PDF report in a single step. Every table states its data source and date.

Our AI principle

Figures are produced only by tested calculation tools; AI does not generate figures, it interprets them. Client data is not used with AI until the legal assessment is complete.

Data security

Your project data is used only for that engagement, protected by a non-disclosure agreement and backed up encrypted.

In your own company: the cross-department bridge

We can build the same approach inside your company: an Excel and dashboard system that connects procurement, site, finance and accounting in a single data flow.

Digital Systems & Academy

Where is your project today?

Let's clarify the need in a short introductory call; we will propose the right service and next step in writing.

Request an introductory call